中国机械行业网站— 专业的机械行业综合服务平台www.yalifei.com
欢迎您,游客 请登录  |  免费注册  | 获客系统
当前位置:首页 > 供应信息 >  试验机 > 
详细介绍

Model: NL-ZFJC-4

The problem

Steam and relief valves that leak are found only after assembly in the machine: rework and complaints follow. The parts are small and the batches large; testing each one on a manual hydrostatic bench is slow and hard to see, and closed and open states usually need two machines, so a few hundred valves a day is out of reach.

Capability

The bench runs a dual state programme in sequence on one machine: with the valve closed, point A is pressurised to 25bar and point B must not leak; with the valve open, point A is pressurised to 25bar and both points B and C must not leak. Four relief valves are tested at a time on two test stations using quick change aluminium fixtures with pneumatic cylinders and quick couplers that clamp and pressurise. A built in booster pump covers 0 to 25bar adjustable, test pressure 0 to 2.5MPa per valve at plus or minus 0.01MPa, monitored on 0 to 25bar direct reading gauges. The water test method makes leak points plainly visible at 0 to 2.5MPa adjustable. Boost and vent times are settable from 0 to 99.99 seconds, the cycle counter runs from 0 to 99999 and stops automatically at the set figure. Standard throughput is 125 units per hour, matching line takt. The electrical platform is selectable among Siemens, Mitsubishi and Omron PLCs with matching touch screens and Schneider low voltage components; a main leakage breaker is fitted, workpieces measure 75 by 45 by 65mm, and under normal maintenance serious faults stay under three per year.

NL test equipment

Applicable standards

GB 4706.1-2024 Safety of household and similar electrical appliances Part 1 General requirements (current); GB 5226.1-2019 Electrical safety of machinery (current); pressurisation points, hold times and dual state judgement follow the customer technical agreement.

Key specifications

  • Test object: coffee machine steam and relief valves, 75 by 45 by 65mm
  • Modes: closed state A to B; open state A to B and C, both at 25bar
  • Batch: 4 relief valves per run on 2 stations
  • Test pressure: 0 to 2.5MPa, plus or minus 0.01MPa
  • Boosting: built in pump 0 to 25bar adjustable
  • Monitoring: 0 to 25bar direct reading gauges
  • Method: water test, leak points plainly visible
  • Timers: boost and vent 0 to 99.99s settable
  • Counter: 0 to 99999, auto stop at set count
  • Throughput: 125 units per hour standard
  • Fixture: quick change aluminium, pneumatic clamp and quick couplers
  • Electrics: Siemens or Mitsubishi or Omron PLC and touch screen, Schneider components
  • Power: AC220V plus or minus 10 percent, 50/60Hz, main leakage breaker

Applications

Outgoing full inspection at steam and relief valve plants; incoming leak checks of valves at coffee machine factories; hydrostatic sealing sampling of small thermostatic and relief valves; sealing verification of valves in third party laboratories

About the manufacturer

Guangdong Endurance Electronic Equipment Co., Ltd provides non-standard customization, drawing confirmation, factory acceptance, on-site installation and commissioning, operation training and long-term technical service; 12-month warranty and long-term spare parts supply. Tel: 0760-88500902 / 13416787649. Web: en.zsnaili.com.

相关分类

地址:中山市小榄镇民安中路163号民安广场1幢25楼25G 联系人:张总 电话:400 000 8722 微信 baxi188699386

机械行业网站 粤ICP备2025387148号-2 网站地图
免责声明:本站只起到信息平台作用,不为交易经过负任何责任,请双方谨慎交易,以确保您的权益。
内容的真实性、准确性和合法性由发布企业或个人负责。如有信息、图片侵权,请及时联系我们处理。
友情提醒:投资有风险 加盟需谨慎